The Project:
The Municipality of West Grey (West Grey) initiated a Schedule ‘B’, Municipal Class Environmental Assessment (MCEA) to investigate alternative options to address through access between Grey Road 12 and Concession Road 8 due to the removal of Structure G-033, located on Traverston Road approximately 0.55 km north of Concession Road 8 and 18 km northeast of the community of Durham over Traverston Creek. “Structure G-033 was removed due to concerns with its structural integrity as identified in a recent OSIM report from 2022, leaving no through access on Traverston Road between Grey Road 12 and Concession Road 8.” (Problem Statement). During this Study process, all reasonable alternatives are being considered including:
1) Do nothing; 2) Permanent closure; 3) Replacement with a single lane bridge structure.
The Study Process:
The Class Environmental Assessment (Class EA) is used to identify, evaluate, and establish a preferred option and make recommendations to address the replacement or closure of Structure G-033. This project is being organized to follow the planning process established for Schedule ‘B’ activities under the Municipal Class Environmental Assessment Act (Municipal Engineers Association, amended February, 2024).
Public Involvement:
Consultation with the public, interested stakeholders, Indigenous communities and regulatory agencies is an essential element and a key component in the planning process. To share information for consideration and influence in the decision-making process, please refer to the contact information below.
Public Information Centre (PIC) No. 1:
The purpose of a Public Information Centre (PIC) is to allow residents and interested stakeholders the opportunity to provide their comments. It is to solicit feedback and input on the Study, as well as to provide an overview of the Study process, to discuss the evaluation of alternative solutions along with the steps that the Municipality is taking towards the preliminary ‘preferred’ alternative. A Public Information Centre and Open House will be held on Thursday, June 6, 2024, drop-in type format, and will be held at the Municipality of West Grey’s Municipal Office at 402813 Grey County Rd 4, Durham, Ontario between 7:00 p.m. and 9:00 p.m.
How to Respond:
If you have any questions, comments, require further information, and/or would like to be added to the project contact list, please contact both of the following:
Project Team:
Geoff Aitken, CET, Manager of Public Works
Municipality of West Grey
402813 Grey Road 4
RR 2 Durham, ON N0G 1R0
Phone: 519-369-2200 Ext. 227
Email: publicworks@westgrey.com
Chris Clark, P. Eng., Consultant Project Manager
Triton Engineering Services Limited
39 Elora Street South (PO Box 159)
Harriston, ON N0G 1Z0
Phone: 519-843-3920 Ext. 250
Fax: 519-843-1943
Email: cclark@tritoneng.on.ca
Comments submitted to the project team for the purpose of providing feedback regarding this Class EA are collected under the authority of the Environmental Assessment Act. Information will be collected in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record. Questions relating to the collection, use and disclosure of this information may be addressed to Chris Clark, Project Manager.